Electrical & Plumbing · Stage 04 · Plus

Electrical plan: where do the outlets go, and the switch on which wall?

Services come after furniture: you can't draw the bedside socket before you know where the head of the bed is, or the oven line before you know where the worktop goes. That's why in Nodaform, MEP is the fifth step, after Furniture and Outdoor; you drop symbols onto the plan and run each circuit from the board to the room.

See the symbols
Schematic layout · Not a substitute for construction drawings
30cm socket height
110cm switch
24Symbol types
3DVisible on the wall
Floor Plan · MEP Layer1:100
Bedroom Kids room Living + Dining Kitchen Bathroom HALLWAY 12.60 m² 13.50 m² 38.00 m² 8.10 m² 7.60 m² 12.00 m 8.00 m
Lighting Socket Switch Circuit Drain
Symbols

24 MEP symbols, one schematic

Symbols from the MEP tab snap to the wall on the plan and align to the furniture. Each one's height is entered separately; in the 3D view they appear on the wall at that height. The low-voltage group has data and telephone outlets, video intercom, doorbell button, security camera, motion detector, alarm panel, Wi-Fi access point, ceiling speaker and low-voltage panel; they are drawn in their own color on the electrical layer, aren't connected to circuits and aren't included in the power calculation.

BOARD

Distribution board

It goes on a wall near the entrance; the circuits start here. Each circuit gets its own breaker row: lighting, sockets, kitchen, air conditioning, oven. The breaker list is written automatically to the sheet you hand to your electrician.

SOCKET

Socket

Click a wall and the half-circle symbol snaps into place. Default height is 30 cm; enter 110 for above the worktop, 200 cm for air conditioning. Earthed, double, splash-proof (IP44) and power socket options.

SWITCH

Switch

It goes on the opening side of the door, next to the handle; Nodaform knows which way the door swings and suggests the spot. Single, two-gang, two-way and dimmer; height 110 cm.

FIXTURE

Lighting

Ceiling light at the center of the room, wall light on the wall, a row of spotlights above the worktop. A line connects each switch to the fixture it controls.

CIRCUIT

Circuits and cables

The line from the board is drawn as a dashed blue line and its length is measured in meters. The cable take-off is totalled on the sheet; the cable size suggestion is for information only.

DRAIN

Drains and plumbing points

With the Add drains button, a drain point drops under the washbasin, kitchen sink, toilet, shower, bathtub, washing machine and dishwasher in one click; water supply and drainage lines in different colors. In the bathroom and kitchen, the distance between sockets and water points is measured, and you get a warning if there's no safety margin left (Pro).

How it works

MEP plan in three steps: from furniture to board

STEP 01

Place symbols around the furniture

A socket next to the bedside table, a double socket above the worktop, a switch on the handle side of the door. The symbol snaps to the wall, and you enter its height in the right panel.

Step 01 · SymbolsGuest room
Guest room of the example duplex: socket, switch and ceiling light symbols placed around the bed, nightstand and wardrobe
STEP 02

Run the circuit from the board

Start from the board symbol and extend the line by clicking on symbols. Symbols on the same circuit connect to the same breaker; the length in meters appears instantly.

Step 02 · CircuitGround floor
Colored circuits run from the panel to the rooms on the same duplex’s ground floor
STEP 03

Hand the sheet to your electrician, walk through in 3D Pro

Breaker list, symbol counts and cable take-off on one page. In the 3D view, sockets sit on the wall at their real height; you see at a glance whether one ended up behind the bedside table.

Step 03 · SheetPro
The editor’s MEP sheet window: symbol list and circuit list with breaker, cross-section and cable length
Spec sheet

Outlet and switch heights from building practice

Heights and distances are pre-filled based on common practice in Türkiye; you can change all of them per object. The schematic is not a construction drawing.

  • Set socket height with a slider; the 3D view updates instantly.
  • In wet areas, the distance between socket and water point is measured, with a warning if it's too close (Pro).
  • Symbol counts and cable take-off are totalled on the sheet and printed to PDF.
Socket
30 cm default · above worktop 110 · air conditioning 200
Switch
110 cm · on the handle side of the door
Distribution board
Bottom edge 150 cm · wall near the entrance
Lighting
Ceiling light at room center · wall light 180 cm
Circuit
Dashed blue line · automatic take-off
Wet area
Socket to water point distance measured, with warnings (Pro)
Export
Schematic layer PNG (Plus) · MEP sheet PDF (Pro)
Plan
Plus · sheet, take-off and wet area warnings Pro
In the 3D view

Sockets on the wall, at their real height

When you turn on the MEP layer in 3D, sockets, switches and fixtures sit on walls and ceilings at their real height. You type the height in the right panel and see in 3D whether it ends up behind the nightstand or the counter.

Explore 3D view
The example duplex’s guest room in 3D at eye level: bed, nightstand, the wall socket next to the nightstand and a smoke detector on the ceiling
3D · guest room, eye level · MEP layer on
MEP by plan

MEP layer on the Plus plan

FREE

Homeowner · Student · Hobbyist

Plan and furniture layers. The MEP tab is visible but locked; you can browse the symbols.

PLUS

Agent · Solo designer

Socket, switch, lighting, distribution board and circuit schematic; wall view in 3D; schematic layer as PNG and scaled PDF.

PRO

Architect · Interior designer · Contractor

Everything in Plus; MEP sheet (PDF), cable take-off, breaker list and wet area safety warnings.

ULTIMATE

Engineer · Design office · Contractor

Everything in Pro; circuit load, breaker and cable size simulation, voltage drop warnings on the plan; symbols are written to the BIM property set.

FAQ

Frequently asked questions

Can I change the socket height?

Yes. The default is 30 cm; you enter values such as 110 cm for sockets above the worktop per object. In the 3D view, the socket appears on the wall at that height.

Does this schematic replace an electrical design?

No. The output is a schematic layout for talking things through with your electrician and electrical engineer. Cable size, breaker rating and construction drawings must be approved by a licensed electrical engineer.

Which plan includes the MEP layer?

The electrical & plumbing layer is on the Plus plan. The MEP sheet, cable take-off and breaker list are on the Pro plan. On the Free plan you can use the plan and furniture layers.

Is plumbing included too?

Drains and plumbing points are on the same layer. Radiator, combi boiler and air conditioning symbols are on the same layer too; drainage lines are drawn in brown, water supply lines in turquoise.

Start

Draw the plan and furniture first; the services go on top.

When you upgrade to Plus, the MEP layer is added straight onto the plan you draw today; no redrawing.

No credit card needed · No install · Paid plans are paid through Paddle